Financial and business news from Bulgaria

The two pipes of the tunnel “Zheleznitsa” are drilled

The two pipes of the tunnel “Zheleznitsa” were drilled, reported today by GP Group JSC, the company that builds the part of the Struma highway, on which the longest road tunnel in Bulgaria is located.
“For a little over a year, without discrepancies the fight is a fact. Tunnel “Zheleznitsa” is an extremely modern facility built using a new Austrian method”, said the company, which is a leading partner in DZZD “AM Struma 2018", which builds the facility.

The 2km tunnel will be with all necessary systems for energy-efficient lighting, ventilation, video surveillance, fire alarm, intelligent traffic control system, emergency SOS cabins, audio and radio disclosure, electronic access control system, etc.



tags: